|
|
|
- Pre-studies and Investigations
|
|
-
Site
visits
-
Literature
survey
-
Data
analysis
|
- Effect
on floor space, both net lettable and plant area.
|
|
|
|
-
Benefits
- Energy
efficiency
- Environment
impact
|
- Effect
on the investment yield from the space requirements of
each system
|
|
|
|
-
Propose
solutions
- Technical
options
-
Layout
of accommodations
|
- Maintenance
and cost in use
|
|
|
|
|
|
|
|
|
|
-
Drawings
- Technical
specifications
|
|
|
|
|
|
|
|
|
|
-
Procurement
- Contract placement
|
|
-
Contracting
- Evaluation
of bids
|
|
|
|
|
|
-
Approve final design
- Inspect components
- Site inventory
|
|
|
|
|
|
|
|
|
|
- Operation and
Maintenance
|
|
|
|
|
|
|
|
-
Remote data acquisition
- Analysis
- Reporting
|
|
|
|
|
|
-
Management of design
- Engineering and implementation
- Cost control
- Quality control
- Project planning and
administration
|
|
|
|
|
|
|